602 Taylor Street

602 Taylor Street is a 19,000 square foot 2-story office building in historic Germantown Nashville. The one-story street elevation respects the scale and streetscape of the neighborhood, and with the materiality of brick, metal, and glass the project reflects much of the industrial character of the original manufacturing site.

The building was completed in the middle of the Covid-19 pandemic in 2020. Several core elements responding to a post-Covid-19 world were incorporated into the design during construction including an HVAC system equipped with ionization technology to scrub the air throughout the building. The interior design supports a world-class office with integrated technological components, several conference rooms and open collaborative spaces, a fully operable glass wall in the break room, and a healthy amount of natural light.